Award detail
APPLICATION PURPOSE: THE PURPOSE OF THIS PROJECT IS TO RESPOND TO TRIBAL TRANSPORTATION PRIORITIES BY CONSTRUCTING A TRIBAL TRANSPORTATION MAINTENANCE FACILITY (TMF) TO ADDRESS THE CHALLENGES ASSOCIATED WITH LIMITED PUBLIC TRANSIT OPTIONS INCREASED TOURISM TRAFFIC AND THE GROWING DEVELOPMENT OF OYATE PLACE.; ACTIVITIES PERFORMED: 40X60 POLE BUILDING: CORE SHELL: - POST SPACING AT 6 OC (EMBEDDED 4-5 BELOW GRADE) 16H SIDEWALL - EXTERIOR PREFINISHED WALL PANEL AND ROOF - 36H WAINSCOT AROUND PERIMETER - 12W X 14H OH DOOR (INSULATED WITH OPERATOR) - INSULATED TO MEET ENERGY CODE REQUIREMENTS - INTERIOR METAL LINER PANELS AT THE CEILING AND WALLS 5 - SOG AT INTERIOR OF BUILDING - 4:12 ROOF SLOPE40X60 POLE BUILDING: INTERIOR BUILD OUT: - ROOMS BUILD WITH 2X4 FRAMING @ 16 OC - WALL HEIGHT AT 8H - DRYWALL FINISHES - HM FRAMES AND WOOD DOORS AT THE INTERIOR - MORTISE DOOR HARDWARE - PLATFORM ON TOP OF ROOMS FOR ADDITIONAL STORAGE: 2X8 WITH 3/4 SHEATHING - RESTROOM WITH FRP AT WALLS - DRYWALL CEILINGS AT SECURITY RESTROOM AND STORAGE - PLUMBING: WATER HEATER EXHAUST FAN TWO FIXTURES IN BATHROOM MOP SINK - (1) FLOOR DRAIN AT RESTROOM INCLUDED FLOOR DRAINS AT SHOP ARE EXCLUDED - GAS FIRED UNIT HEATER IS ASSUMED FOR THE OPEN AREA - FIRE SUPPRESSION IS INCLUDED - FIRE ALARM IS EXCLUDEDSITEWORK: - SITE IS ASSUMED TO BE LEVEL AND NOT REQUIRE EXPORTING MATERIAL - ASSUMES UTILITIES ARE IN PLACE (SEWER WATER GAS FIBER POWER) - UTILITY CONNECTIONS ARE EXCLUDED - ALLOWANCE FOR LANDSCAPING IS INCLUDED (IRRIGATION IS EXCLUDED)CONCRETE APRON 60X53.57: - GRADING AND CLASS PREP FOR UNDER THE CONCRETE APRON - 6 UNREINFORCED CONCRETE DRIVE/APRON IS ASSUMEDFENCES GATES: - ALLOWANCE OF $45000 IS INCLUDED FOR FENCE GATES; EXPECTED OUTCOMES: THIS PROJECT WILL SUPPORT THE STORAGE AND UPKEEP OF ESSENTIAL PUBLIC VEHICLES INCLUDING SHUTTLES SNOWPLOWS AND MAINTENANCE TRUCKS. IN ADDITION TO IMPROVING EMERGENCY RESPONSE AND SERVICE DELIVERY ESPECIALLY DURING OUR HARSH WINTERS THE FACILITY WILL HELP EXTEND THE LIFESPAN OF TRIBAL ASSETS REDUCE OPERATIONAL COSTS AND STRENGTHEN THE TRIBES CAPACITY TO PROVIDE YEAR-ROUND RELIABLE TRANSPORTATION SERVICES. ADDITIONALLY THE FACILITY WILL SUPPORT BROADER COMMUNITY OUTCOMES INCLUDING SAFER PEDESTRIAN ACCESS IMPROVED MOBILITY FOR RESIDENTS WITHOUT PRIVATE TRANSPORTATION AND GREATER RESILIENCE DURING SEVERE WINTER WEATHER EVENTS. CORE OUTCOMES: IMPROVED TRIBAL TRANSPORTATION INFRASTRUCTURE: THE DEVELOPMENT OF THIS FACILITY WILL PLAY A PIVOTAL ROLE IN STRENGTHENING THE PIICS TRANSPORTATION INFRASTRUCTURE. BY PROVIDING A SECURE CENTRALIZED SPACE FOR THE STORAGE AND MAINTENANCE OF PUBLIC TRANSPORTATION VEHICLES THE PROJECT WILL ENHANCE THE RELIABILITY AND LONGEVITY OF CRITICAL FLEET ASSETS SUCH AS SHUTTLES SNOWPLOWS AND MAINTENANCE VEHICLES. ENHANCED COMMUNITY QUALITY OF LIFE: PRIORITIZING THIS INVESTMENT ALLOWS PIIC TO IMPROVE YEAR-ROUND ACCESSIBILITY REDUCE SERVICE DISRUPTIONS AND ENSURE THAT TRANSPORTATION SERVICES ARE EFFICIENT SUSTAINABLE AND RESPONSIVE TO THE NEEDS OF A GROWING POPULATION. ULTIMATELY THE PROJECT WILL CONTRIBUTE TO THE OVERALL HEALTH SAFETY AND QUALITY OF LIFE FOR ALL COMMUNITY MEMBERS.; INTENDED BENEFICIARIES: THE CONSTRUCTION OF A TRANSPORTATION MAINTENANCE FACILITY WILL YIELD BROAD AND LASTING BENEFITS FOR THE PIIC PARTICULARLY FOR THE TRIBAL MEMBERS AND FAMILIES WHO RESIDE IN OR FREQUENTLY VISIT OUR COMMUNITY. AS A RESULT OF THE TRIBES ECONOMIC SUCCESS THE COMMUNITY NOW EXPERIENCES A SIGNIFICANT AND GROWING VOLUME OF TRAFFIC WITH AN AVERAGE OF 5000 VISITORS TRAVERSING LOCAL ROADS EACH DAY. DURING LARGE-SCALE EVENTS SUCH AS SUMMER OPEN-AIR VENUES AND CULTURAL CELEBRATIONS PEAK POPULATIONS CAN EXCEED 30000 (SEE MAP PAGES 2-4). THIS SHARP INFLUX PLACES INCREASING DEMAND ON TRANSPORTATION INFRASTRUCTURE AND SERVICES. SO IN ADDITION TO SERVING RESIDENTS THE FACILITY WILL SUPPORT THE SAFETY AND MOBILITY OF THOUSANDS OF MOTORISTS WHO TRAVEL THROUGH THE COMMUNITY TO ACCESS PIICS TOURISM HOSPITALITY AND CULTURAL ATTRACTIONS. BY ENSURING THE UPKEEP AND AVAILABILITY OF PUBLIC SERVICE VEHICLES INCLUDING SHUTTLES MAINTENANCE TRUCKS AND SNOWPLOWS THE NEW FACILITY WILL HELP PIIC MEET CURRENT AND FUTURE TRANSPORTATION DEMANDS. CORE BENEFICIARIES:MOTORIST: THE PROJECT WILL IMPROVE TRAFFIC FLOW FOR MOTORIST USING OUR ROADWAYS ENHANCE PUBLIC SAFETY FOR ALL TRAVELING OUR ROADWAYS SUPPORT EVENT LOGISTICS AND ENSURE A HIGH-QUALITY EXPERIENCE FOR BOTH RESIDENTS AND VISITORS. THE TRIBAL COMMUNITY: THE PROJECT WILL CONTRIBUTE TO LONG-TERM SUSTAINABILITY OF PIIC BY PROTECTING CRITICAL TRANSPORTATION ASSETS AND ENABLING THE TRIBE TO DELIVER CONSISTENT RESPONSIVE SERVICES YEAR-ROUND.; SUBRECIPIENT ACTIVITIES: WE WILL NOT HAVE SUBRECIPIENT ACTIVITIES
Review direct federal award facts for Prairie Island Indian Community, including awarding and funding lanes, performance dates, category codes, and source description, then move into the broader recipient, buyer, and market context quickly.
Award amount
$1,117,025
Recipient
Prairie Island Indian Community
Awarding agency
Department of Transportation
Source code
NAICS 921150
Award summary
Key facts from the source record
Total obligation
$1,117,025
Award type
PROJECT GRANT (B)
Awarding office
REGION 5 DOT FTA
Prairie Island Indian Community
Department of Transportation
Federal Transit Administration
Department of Transportation / Federal Transit Administration
MN
2025-09-04
2026-12-30
$1,117,025
Award description
What the source record says
APPLICATION PURPOSE: THE PURPOSE OF THIS PROJECT IS TO RESPOND TO TRIBAL TRANSPORTATION PRIORITIES BY CONSTRUCTING A TRIBAL TRANSPORTATION MAINTENANCE FACILITY (TMF) TO ADDRESS THE CHALLENGES ASSOCIATED WITH LIMITED PUBLIC TRANSIT OPTIONS INCREASED TOURISM TRAFFIC AND THE GROWING DEVELOPMENT OF OYATE PLACE.; ACTIVITIES PERFORMED: 40X60 POLE BUILDING: CORE SHELL: - POST SPACING AT 6 OC (EMBEDDED 4-5 BELOW GRADE) 16H SIDEWALL - EXTERIOR PREFINISHED WALL PANEL AND ROOF - 36H WAINSCOT AROUND PERIMETER - 12W X 14H OH DOOR (INSULATED WITH OPERATOR) - INSULATED TO MEET ENERGY CODE REQUIREMENTS - INTERIOR METAL LINER PANELS AT THE CEILING AND WALLS 5 - SOG AT INTERIOR OF BUILDING - 4:12 ROOF SLOPE40X60 POLE BUILDING: INTERIOR BUILD OUT: - ROOMS BUILD WITH 2X4 FRAMING @ 16 OC - WALL HEIGHT AT 8H - DRYWALL FINISHES - HM FRAMES AND WOOD DOORS AT THE INTERIOR - MORTISE DOOR HARDWARE - PLATFORM ON TOP OF ROOMS FOR ADDITIONAL STORAGE: 2X8 WITH 3/4 SHEATHING - RESTROOM WITH FRP AT WALLS - DRYWALL CEILINGS AT SECURITY RESTROOM AND STORAGE - PLUMBING: WATER HEATER EXHAUST FAN TWO FIXTURES IN BATHROOM MOP SINK - (1) FLOOR DRAIN AT RESTROOM INCLUDED FLOOR DRAINS AT SHOP ARE EXCLUDED - GAS FIRED UNIT HEATER IS ASSUMED FOR THE OPEN AREA - FIRE SUPPRESSION IS INCLUDED - FIRE ALARM IS EXCLUDEDSITEWORK: - SITE IS ASSUMED TO BE LEVEL AND NOT REQUIRE EXPORTING MATERIAL - ASSUMES UTILITIES ARE IN PLACE (SEWER WATER GAS FIBER POWER) - UTILITY CONNECTIONS ARE EXCLUDED - ALLOWANCE FOR LANDSCAPING IS INCLUDED (IRRIGATION IS EXCLUDED)CONCRETE APRON 60X53.57: - GRADING AND CLASS PREP FOR UNDER THE CONCRETE APRON - 6 UNREINFORCED CONCRETE DRIVE/APRON IS ASSUMEDFENCES GATES: - ALLOWANCE OF $45000 IS INCLUDED FOR FENCE GATES; EXPECTED OUTCOMES: THIS PROJECT WILL SUPPORT THE STORAGE AND UPKEEP OF ESSENTIAL PUBLIC VEHICLES INCLUDING SHUTTLES SNOWPLOWS AND MAINTENANCE TRUCKS. IN ADDITION TO IMPROVING EMERGENCY RESPONSE AND SERVICE DELIVERY ESPECIALLY DURING OUR HARSH WINTERS THE FACILITY WILL HELP EXTEND THE LIFESPAN OF TRIBAL ASSETS REDUCE OPERATIONAL COSTS AND STRENGTHEN THE TRIBES CAPACITY TO PROVIDE YEAR-ROUND RELIABLE TRANSPORTATION SERVICES. ADDITIONALLY THE FACILITY WILL SUPPORT BROADER COMMUNITY OUTCOMES INCLUDING SAFER PEDESTRIAN ACCESS IMPROVED MOBILITY FOR RESIDENTS WITHOUT PRIVATE TRANSPORTATION AND GREATER RESILIENCE DURING SEVERE WINTER WEATHER EVENTS. CORE OUTCOMES: IMPROVED TRIBAL TRANSPORTATION INFRASTRUCTURE: THE DEVELOPMENT OF THIS FACILITY WILL PLAY A PIVOTAL ROLE IN STRENGTHENING THE PIICS TRANSPORTATION INFRASTRUCTURE. BY PROVIDING A SECURE CENTRALIZED SPACE FOR THE STORAGE AND MAINTENANCE OF PUBLIC TRANSPORTATION VEHICLES THE PROJECT WILL ENHANCE THE RELIABILITY AND LONGEVITY OF CRITICAL FLEET ASSETS SUCH AS SHUTTLES SNOWPLOWS AND MAINTENANCE VEHICLES. ENHANCED COMMUNITY QUALITY OF LIFE: PRIORITIZING THIS INVESTMENT ALLOWS PIIC TO IMPROVE YEAR-ROUND ACCESSIBILITY REDUCE SERVICE DISRUPTIONS AND ENSURE THAT TRANSPORTATION SERVICES ARE EFFICIENT SUSTAINABLE AND RESPONSIVE TO THE NEEDS OF A GROWING POPULATION. ULTIMATELY THE PROJECT WILL CONTRIBUTE TO THE OVERALL HEALTH SAFETY AND QUALITY OF LIFE FOR ALL COMMUNITY MEMBERS.; INTENDED BENEFICIARIES: THE CONSTRUCTION OF A TRANSPORTATION MAINTENANCE FACILITY WILL YIELD BROAD AND LASTING BENEFITS FOR THE PIIC PARTICULARLY FOR THE TRIBAL MEMBERS AND FAMILIES WHO RESIDE IN OR FREQUENTLY VISIT OUR COMMUNITY. AS A RESULT OF THE TRIBES ECONOMIC SUCCESS THE COMMUNITY NOW EXPERIENCES A SIGNIFICANT AND GROWING VOLUME OF TRAFFIC WITH AN AVERAGE OF 5000 VISITORS TRAVERSING LOCAL ROADS EACH DAY. DURING LARGE-SCALE EVENTS SUCH AS SUMMER OPEN-AIR VENUES AND CULTURAL CELEBRATIONS PEAK POPULATIONS CAN EXCEED 30000 (SEE MAP PAGES 2-4). THIS SHARP INFLUX PLACES INCREASING DEMAND ON TRANSPORTATION INFRASTRUCTURE AND SERVICES. SO IN ADDITION TO SERVING RESIDENTS THE FACILITY WILL SUPPORT THE SAFETY AND MOBILITY OF THOUSANDS OF MOTORISTS WHO TRAVEL THROUGH THE COMMUNITY TO ACCESS PIICS TOURISM HOSPITALITY AND CULTURAL ATTRACTIONS. BY ENSURING THE UPKEEP AND AVAILABILITY OF PUBLIC SERVICE VEHICLES INCLUDING SHUTTLES MAINTENANCE TRUCKS AND SNOWPLOWS THE NEW FACILITY WILL HELP PIIC MEET CURRENT AND FUTURE TRANSPORTATION DEMANDS. CORE BENEFICIARIES:MOTORIST: THE PROJECT WILL IMPROVE TRAFFIC FLOW FOR MOTORIST USING OUR ROADWAYS ENHANCE PUBLIC SAFETY FOR ALL TRAVELING OUR ROADWAYS SUPPORT EVENT LOGISTICS AND ENSURE A HIGH-QUALITY EXPERIENCE FOR BOTH RESIDENTS AND VISITORS. THE TRIBAL COMMUNITY: THE PROJECT WILL CONTRIBUTE TO LONG-TERM SUSTAINABILITY OF PIIC BY PROTECTING CRITICAL TRANSPORTATION ASSETS AND ENABLING THE TRIBE TO DELIVER CONSISTENT RESPONSIVE SERVICES YEAR-ROUND.; SUBRECIPIENT ACTIVITIES: WE WILL NOT HAVE SUBRECIPIENT ACTIVITIES
Federal source facts
Direct USAspending detail fields
Source essentials
This is the shortest high-signal version of the federal award record. Open the deeper sections only when you need party, contract, or financial detail.
ASST_NON_MN-2025-024_069
268549246
grant
PROJECT GRANT (B)
Department of Transportation / Federal Transit Administration
REGION 5 DOT FTA
Department of Transportation / Federal Transit Administration
OFFICE OF BUDGET AND POLICY(TBP)
ZXWAV8U3K5E4
WELCH, MN
MN
2025-09-04
2026-12-30
2026-03-30
Parties and locations
Recipient, parent, address, and place-of-performance detail straight from the source record.
6 facts+
Parties and locations
Recipient, parent, address, and place-of-performance detail straight from the source record.
Prairie Island Indian Community
5636 STURGEON LAKE RD | WELCH, MN, 55089 | UNITED STATES
GOODHUE
01
MN
MN | UNITED STATES
Contract mechanics
Competition, solicitation, vehicle, pricing, and acquisition context for the award.
0 facts+
Contract mechanics
Competition, solicitation, vehicle, pricing, and acquisition context for the award.
Contract mechanics not surfaced
The direct award endpoint did not return additional contract mechanics for this record.
Financial trail
Obligation, outlay, options, and subaward figures when the source record exposes them.
2 facts+
Financial trail
Obligation, outlay, options, and subaward figures when the source record exposes them.
$1,117,025
0
Recipient business categories
Government, Native American Tribal Government
Recipient context
The company profile behind this award
Category context
Industry and service lanes around this award
Explore rankings
